The fundamental components here are laziness and weak connections between graph nodes. Node values are getting materialized only when you observe them, and the system is flexible for live structural changes.
Usually, you don't need to materialize the entire graph when you need to observe just some nodes. Additionally, you can halt computations at any point in time leaving the graph in semi-actualized state, make extra changes to the inputs, and continue materialization of the nodes of interest. The algorithm will sort out all changes for you.
Essentially, incremental computations is just a term covering these features. You can organize the same system in terms of observers and subscribers.
Perhaps, classical Excel spreadsheets is the best illustration of the idea. Also, see my article on the topic: https://medium.com/@eliah.lakhin/salsa-algorithm-explained-c...
Also, the differences between "hot" and "cold" observers and the use of schedulers.
I like that about the observable pattern that while hot versus cold is confusing, it is generally "explicit" in the dance of observers/subscribers. I also tend to like the way that observable schedulers and scheduling operators are often usefully explicit in halting computations while still being largely automated in the time domain.
Certainly my gut instinct with this specific library is seeing if the stuff being done with it might be a cleaner fit in something like RxOcaml, but I realize I'm in something of a minority in preferring explicit observable operators over implicit "computation signals".
However I'm not sure Excel is such a great illustration in that case, as it's neither lazy nor weakly connected; at least at the surface.
I distinctly remember being amazed that it would just iterate until it reached equilibrium (maybe we had to change some setting somewhere first though, I never really used Excel before or after that). I think you could change a value mid-iteration, and the grid would just continue on with the previously calculated cell values, instead of start over from scratch. That's basically "weakly connected", isn't it?
(anyway, the real challenge is to find a practical use for Excel's hidden fractal powers https://www.youtube.com/watch?v=b-Fa6HtvGtQ)
You are right, it is assumed that in general the average node function evaluation is more expensive than the cost of graph management. It's not too expensive, but if by chance node's function is notably cheaper, this approach could be suboptimal in certain cases.
The key insight here is that it is assumed the end user don't need to actualize the entire graph each time any random input is being changed. The user observes only a small portion of the graph nodes in real time, and the incremental computation system ensures to minimize required evaluations. If this local observability is not a goal the system is not incremental by definition. For example, in case of Spreadsheets the entire table could be 10000x10000 cells, however the end user typically sees only a small portion of the table on the screen. On a general note the incremental computation systems are closely tied to the GUI-related tasks.