by tyfon · 4mo ago · 0 comments
I hope not though, perhaps I can pick up a H100 in a few years if they get sold on the open market.
why would anyone sign such a contract?
If you want to switch back to on prem, there's probably a way to structure acquiring hardware so it doesn't break the contract. Maybe you lease it, maybe the purchase happens through a related company, maybe there was no way for the contracted cloud to find out...
Plausible - the hardware might be leased, and so you have no right to modify it. You have to pay them to modify it.
Same as if you leased a car, you cannot do the services yourself, you have to pay them (and an approved agent of theirs) to do it.
Where folks (often) get lazy is the resulting math over what the real bean-counters care about (but are too lazy to check often).
In a past life, I worked on costing models for a Cable/Fiber contract house, to help the company decide 'what was profitable to keep in house' versus 'what do we subcontract' (sometimes that could even mean we just 'rented' a machine and had a qualified operator using it, based on that employee's hourly rate and expected L2R for taxes... so many spreadsheets...)
And from from my 'I don't know all the factors for this but I've seen how people screw up the big ones' view (and frankly, I'm guessing a lot of us have seen and dealt with the same category of 'bad math' around outsourcing IT work...)
An on-prem data center means:
- You need to account for electricity costs - i.e. CA vs midwest electric rates.
- cooling and power backup capability - Smaller factor but real
- personnel cost - e.x. there's probably cases where a smaller org could be better off with 'on-site' server admins that have other roles based on local wages. Kinda case specfic but it's a case.
- whatever the 'space' holding the stuff costs
- Sardonic take :Hey, let's have another unused meeting room instead! (e.x. In the case of on-prem shops that simply fled to AWS in their migration from VMware)
- the cost of licensing whatever is running
- In defense of this, In one of my earliest IT lives, AWS handling the Oracle licensing for a DB was a *huge* win as far as making it as easy as possible to ensure whatever was going on we couldn't have the Oracle licensing folks 'ding' us on whatever infraction occurred between reviews (that could not be understood by the majority of the company, often including the accused. I was never guilty but I saw it happen to others.)
- OTOH I know lots of folks who just want to be lazy about what they have to document.
Still, IMO a lot of orgs don't do the right math around these decisions, or just buy into the 'Well trends can change' as though they can decide as an org they need to suddenly triple capacity in a month and it would be able to organically happen in the first place.Frankly, the orgs that 'might' need that either have their arch set up where they are in cloud, or they are onprem but can scale to cloud if needed in interim.
It will be perfect for stuff like GPU-accelerated query engines, "classical ML" and every other CPU-based workload that could conceivably be offloaded to GPU
You can get used 16GB P100s on AliExpress for ~$100 if you want obsolete GPUs. Allegedly new AMD BC 250s are only slightly more.
I've looked at this some but I already have a GTX1070 which is only supported upto CUDA 11.9.
That's precludes some interesting modern optimizations out of the box. I've spend a lot of LLM tokens backporting some things, but I'm really not sure the hassle is worth it.
New hardware is just better. I think in maybe 5 years when supply and demand are back in equilibrium we are going to have some killer technology for decent prices, and 15yo H100s won't look attractive.
In a recent Gamer Nexus video with Level 1 Tech, they mention V100s are also quite useful for many applications that use FP64: stuff four in a workstation, and many PhD candidates would be quite happy with the throughput they can get for certain scenarios.
This is assuming that there is no big, big disruption to the semiconductor industry (e.g. TSMC getting attacked), in which case... well, I am gonna treat each stick of RAM I currently have like it's a faberge egg.
Is the idea that previously maintaining GPU programs was expensive whereas now AI makes it cheap? If so, I could buy that line of reasoning.
Maybe relatedly, I expect (hope) the hardware manufacturers will ramp up supply in the meanwhile which would also put downward pressure on GPUs. Right now though this hardware crunch is making me sad, not even because of GPUs but also because of general memory / disk.
TL;DR.
> I, for one, welcome the coming age of the post-LLM-datacenter-overinvestment-bust-fueled backyard GPU supercomputer revolution.
> The Big Question is…
> Who is cultivating the option to snap up and repurpose vapourised datacenter investments at fire sale prices, soon as the "datacenter debt" cometh calling?
Maybe someone could start a business buying up and rehousing these.
And precisely because it's such a huge headache to do yourself, I think a small company could make a nice business wrapping up used datacenter cards in that sort of server.
The electricity prices are relevant because if you paid $0 for your H100 and didn't use it a single time, you could buy millions of tokens in inference just on the electricity it draws while idling. If you can't keep that thing saturated through the night, you're probably underwater overnight. Likewise, it's too small to run even the frontier open source models so you need to be able to live with worse models.
Max power matters because you aren't going to run many of those H100s before you blow breakers in most houses. Newer houses in the US are 15A service to non-kitchen breakers, so 1650W (that might be peak rather than continuous, not sure). If you're plugging that into an existing run, you could maybe run 2 before you start blowing breakers? You can't just plug 4 H100s into the wall in a normal house.
Maybe I'm wrong, though. I'd be curious, it'd be neat to run my own inference for something more than what'll run on a 3080.
Models are too big now
if you haven't heard a 5u server intended for a datacenter rack come to life it's quite the experience. Sounds like a plane taking off.
Helicopter. I live in Yeovil, Somerset, UK - there's a helicopter factory just down the road. I had a IBM "AS/400" or whatever they are called now in our computer room rack for a customer and it made nearly as much noise as everything else put together. It was clearly tuned for start up noise to impress because they would fire up in sequence, rise to a crescendo and then slow down in sequence to just a din instead of painfully loud.
A switch or PC server on boot will normally run up cooling fans instantly to max as a default protection mechanism until the "OS" has started and sensors read and then the fans will slow down to deal with the actual thermal load.
If you switch off your air conn, it gets noisy, quickly. Recently in the UK we are seeing routine temperatures around 30C and we broke 200 odd year records for temperatures a few weeks back. I know its even worse elsewhere but our infrastructure is not designed for this. Here we are at the same latitude as Calgary AB!
Until the thermal management kicks in, they sound like jet planes. When the thermal management starts and assesses the required cooling, it’ll throttle down the fans to reasonable levels.
That is, until the moment you push the machine to its limits. When then happens, you might get back to the same levels of the boot time, but it’ll require you to push everything to the max - CPU, memory, storage (all 24 bays) and so on. For a normal user, there is a lot of room and it’s virtually impossible, even with a dozen of Teams windows open.
You don't need much of a fan if you are prepared to pump a lot of water.
I mean, sure, if you're trying to cool the thing with 100ml of water, then yeah, you need a fan.
OTOH I have an unused car radiator in my garage, a quiet and cheap pump, and space to hang that radiator outside the window. It's barely an afternoon's worth of work if the H100s already have liquid-cooling intakes/exhausts on them already (I dunno, I have never seen one in the flesh).
I'm pretty certain 10+ litres of constantly circulating water (antifreeze, in my case) through a car radiator would be sufficient to cool down 2x H100s. Hell, add in 10 RPM used car cooling fan and I can probably cool 20x of those running at full-bore.
If anyone wants to ship me a bunch of H100s, I'll happily build it all out, take pics and videos and post it back here. Just sayin' :-)
These things get hot and are fussy about their requirements.
In North America we are on 120V, making a standard 15A outlet only 1500W max, and something like 1200W sustained. To use higher wattage appliances, we have to upgrade our outlets to 20A (2000/1600W) or up our voltage to 240V, but that carries a different set of plugs and outlets as well.
1500W is the power of the typical American microwave or (tea) kettle at 120V. (Convert over to a NEMA 6 plug and dual-pole breaker and you can get 3000W.)
3000W is nothing special in the rest of the world with >200V wall plugs.
By doing that, you know upfront what the value of your used hardware will be at the time you decommission it. It removes a lot of the risk for buyers in a volatile market.
For example, when I worked at a VFX software company, we were exclusively with one hardware partner. This unlocked something like a 50% discount across all our infra needs (they were big enough to provide switches, racks, servers, storage)
another company it unlocked a 75% discount.
I don't think they need some special protection against this kind of contract.
a) It's not fraudulent, and
b) Nvidia has already signed on to buyback any unused capacity from the DCs it is selling to.
I don’t understand the desire to tell totally anonymous third parties the terms under which they are allowed to deal with each other.