by onder_ceylan · 2mo ago · 0 comments
I'm interested to see the total inference cost of a ticket type, that's why total cost is compared. Even though most of the cost is there in other stages, there's still huge difference even with one variable configuration in the loop.
The cost of each builder is also shown in mission breakdown, but good feedback for extending some of the tables, thanks!