by mauvehaus · 1mo ago · 0 comments
I would also suggest that size and weight are bigger concerns than you're giving credit to. They aren't assembling packs on-site from individual batteries. They're rolling in whole-ass packs in one swell foop. Getting them into basements isn't a small job[0]. Getting them back out will be even less fun for the crews.
Their total on-site install time was maybe 6 hours, and that included tying everything in to the existing system. Putting the hardware in place took maybe an hour of that time. If you want to go with heavier packs or more/larger packs, you're going to add to that a bit. And their doing this in people's finished homes. This isn't new build where they can have a couple of big dudes wrangling packs around without a care in the world for furniture and finished surfaces. The ergonomics of smaller packs matter.
[0] They used a two-wheel dolly with a hydraulic disc brake (bicycle hardware) to get them down our basement stairs.
Seems like the former would have some development costs but ultimately be cheaper to manage
Also, you're reducing demand on the grid by having them at people's homes, not just reducing the demand on the power plants. If the batteries were centralized you'd still need to move that massive amount of power over distribution and transmission lines, which is actually just as big a problem as needing to spin up a peaker plant. In many areas the bottleneck is transmission not generation
I guess Vermont’s relatively low population density makes that more likely; with lower population density each service station will either service fewer homes or require more cabling towards those homes. Either way, more cabling is needed per house. Upgrading that to handle the load of charging a car can be costly.