More solar asap is definitely a good thing, but we also need to plan for what happens 30-40 years from now when this wave of equipment starts failing.
Municipalities often have bonkers cost structures and imposed limits on tax increases (limits in state laws and such). Here they are redoing lead service lines, rebuilding substandard water mains and repaving streets. State and Federal grants are paying for a lot of it, along with increases to water rates (to maybe 5-10% above the national average, enough to make people unhappy, but not out of control).
That's a common claim but it's not really correct.
Firstly, the average plant in the US spends it's construction costs every 2-3 years, I assume the situation is similar in the EU. New power plants are much more expensive of course, because the old ones were built before Chernobyl, Fukushima, 9/11 and other incidents that revealed horrible security flaws in existing plants and procedures.
Secondly, the costs of handling Chernobyl are way, way higher than the total cost of construction for all nuclear plants in the EU combined. Similarly the cost of managing Fukushima is way higher than the cost of constructing all the nuclear plants in Japan. These costs are of course never added to the cost of nuclear power, since nobody operating nuclear plants has any chance of paying such sums. But they are in fact a larger factor than the construction costs were.
These experiences did have some effect, thankfully, in that made new power plants more expensive, because we know that we must take any conceivable measure to prevent more Chernobyls and Fukushimas from happening.
And thirdly, the reason why Sweden closed the two most recent reactors was cost, despite them being paid off a long time ago. Meaning there is significant cost even after the construction is paid.
So it seems that the claim that "construction is the main cost" comes from the operator's point of view. Basically "the construction is the largest part WE have to pay, because taxpayers cover the rest".
It's a common claim because it's correct.
> the average plant in the US spends it's construction costs every 2-3 years
That includes paying principal and interest on the construction loans, right?
> New power plants are much more expensive of course, because the old ones were built before Chernobyl, Fukushima, 9/11 and other incidents that revealed horrible security flaws in existing plants and procedures.
The modern cost increases have nothing to do with actual deficiencies in older US plants. Chernobyl had no containment building and a positive void coefficient. Even the US nuclear power plants build in the 1960s have a containment building and a negative void coefficient.
> Secondly, the costs of handling Chernobyl are way, way higher than the total cost of construction for all nuclear plants in the EU combined.
It's a good thing none of the US nuclear plants have ever been Soviet RBMKs then.
> And thirdly, the reason why Sweden closed the two most recent reactors was cost
The reason was that their electricity prices were very low at the time from a combination of having a large amount of hydro and the then-price of natural gas being low. Most places have no ability to control either of those things. Meanwhile how is the decision to close those reactors looking given how prices are now?
At a certain point it just becomes cheaper to build a brand-new one right next to it and decommission the old one, even with a nuclear reactor.
There are nuclear plants built in the 60s and 70s that are not only still operating but in the process of extending their operating licenses in order to keep operating for decades more. The period of time it takes before this makes "keep operating it" unviable is evidently pushing 80 years without actually hitting the limit.
Control rooms and reactor vessels are themselves made of modular components and a lot of maintenance to those things happens during refueling.
> On top of that it locks you in to an old reactor design, which might be very undesirable for safety reasons.
That can't be the argument against building new ones. It's the argument that what you want is to build the newer, safer designs and then operate those for a long time.
Your concern would be valid for a nuclear thermal power station, a Goldberg machine with millions of moving parts. It is not really applicable to semiconductors.
For solar PV it is ~30 years.
While the cell may continue to generate power, it may have diminished so greatly as to no longer justify its physical footprint
So, as a rule of thumb, the solar panel loses approximately 1% per year. So after 30 years it's generating around 70% of rated capacity.
At that (or any earlier or later) point one could replace the panels. That's really cheap to do, and can be done with more-or-less unskilled labor.
If you are space-constrained (like your residential roof) then you'll likely do it earlier.
If you are a commercial producer, sitting in a desert somewhere, it'll likely be better to just "plant another field" next door. Keep the 70% (it's free), and bolster capacity by adding more panels, not replacing old ones.
And this is before we take into account places where the ecology under the panels has changed and become more valuable in its own right.
So 25 years from now, or maybe 10 years from now, it might pay to replace panels. Which may in turn lead to very cheap 75% 2nd hand panels becoming widely available.
This house of cards obviously falls down when expansion ever slows down. The only solution is to raise the property taxes per yard of road, but that means low-density housing becomes unaffordable, which would force towns to increase density by building things like row houses and apartment buildings.
Solar is in a completely different position, as the solar itself is profitable. There will be no shortage of cash to replace it, only perhaps a shortage of labor. But solar doesn't really have a fixed lifetime and will happily operate a few years longer, and due to its highly distributed nature it doesn't require a risky all-at-once replacement like the Boston Big Dig either.
The global solar rollout is going slow enough that it won't be finished before the first units will reach the end of their economical lifespan. I reckon it'll just shift into ongoing maintenance as time goes on.
If you don't spend the profits on other things, which people are liable to do. The point is for there to be some awareness of oncoming costs.