by sarchertech · 2w ago · 0 comments
But that’s a feedback loop that could lead to more supply being built. Or it could lead to regulations that put enormous surcharges and low limits on data center power consumers, which effectively shield consumers directly from the lack of supply. Which in turn removes the incentive for consumers to expand power generation capacity to keep up (or to allow data centers to expand it themselves).
There is enormous opposition to a new data center project 30 miles outside my city because they want to build a 1000MW natural gas power plant and a 500MW biomass plant (that will take millions of acres of forest to sustain).
If that opposition continues, I see little chance of anything but electricity cost rising as a percent of inference.
This would be the largest biomass plant in the US. 5x larger than the next largest plant.
A 500MW plant would require almost 50x the amount of available waste material from logging and sawmill operations in the entire state of TN (where the plant is being built).
The developer of the project said that the plant was designed to create demand for low grade pine timber following pulp mill closures in the area and that the plant will burn between 350-500 truckloads of logs per day.