95 points · by Betelbuddy · 1w ago · 104 comments
One thing to note is that the framing "Just 400 US Data Centers" makes it seem like 400 out of the gazillion data centers use this much electricity, but the original research seems to be that they found exactly 403 "Hyperscale Data Centers" and evaluated them.
The framing is technically correct (since there exist non-hyperscale data centers) but is clearly intended to be deceptive.
[1] https://hsph.harvard.edu/news/hyperscale-data-centers-energy...
Total Primary Energy (Coal + Gas + Grid) ~1,050 – 1,150 TWh/yr (~120–130 GW avg)
Electrical Power Only ~105 – 150 TWh/yr (~12–17 GW avg)
Top ~400 Hyperscale Data Centers
Electrical Power Only ~68 – 99 TWh/yr (~7.8–11.3 GW avg)
>The team then modeled these facilities’ energy use in a variety of scenarios and calculated the energy mix of the regional grids to estimate individual facilities’ carbon emissions.
So is it just made up? The facilities energy usage that is?
Downstream re-reporting (Wired, NYT, etc) mixes these interchangeably, or picks 1 and treats it the same as the other.
Step 2: find “thing 2” with property x closest to (result of Step 1) && x <= (result of Step 1)
Step 3: Write clickbait.
Optional: Publish some permutations - resample list of “thing 1” to yield min(number of “thing 1”) matching “thing 2” for each “thing 2” in list
AI on the other hand..
At this point I am not even sure why should we continue to read anything from mainstream media. Other than some sort of civil duty to continue correct them or bring it context / communities notes.
I am also wondering why Datecenter and AI is now becoming the new Anti-Christ / Nuclear Reactor.
there’s no need to understand people’s reaction to misleading tertiary sources
>the data did not allow them to differentiate between power used for general-purpose versus AI-specialized operations at each HDC
That seems like an important distinction. Many people reading the headline will immediately assume this refers to AIDCs only, especially those who never heard of or rarely thought of data centers until recently.
>HDC electricity demand corresponded to approximately 1.8% of total U.S. electricity consumption
I don't see a problem with this. The only real issue is in cases of added load to local grids increasing costs. It is useful to look at historical electricity production in the US.[0] If anything the period of stagnation starting from 2007 is an anomaly. That stagnation was probably caused by the GFC, de-industrialization, improved energy efficiency and a decreased (but still positive) population growth rate. I don't think anyone protested the 25% increase in electricity production from 1990 to 2000, for example.
By the way, your first link appears to be cut off, full link is this:
Hyperscale data centers’ energy consumption, carbon emissions newly estimated by researchers https://hsph.harvard.edu/news/hyperscale-data-centers-energy...
[0] https://www.eia.gov/totalenergy/data/browser/?tbl=T07.01#/?f...
I would assume you wouldn't select the 400 smallest data centers and 400 random data centers would be weird to write an article about, so I defaulted to thinking the 400 largest(with available data). Was this assumption wrong? Where is the deception? Is it Michigan?
Here's how it was misleading to me personally: when I heard "Just 400 Data Centers" I interpreted that initially as there are lots of data centers, say, 1000, but it only takes 400 of them to equal the power of Michigan, so wow! the full set of data centers must use an enormous amount of power!
But now this comment clarified that the initial study looked at all the hyperscalars in the US (403). So it wasn't like it was choosing a subset to equal a known amount of power, it was putting all the power into context. If the headline were instead: "All the Hyperscalar Data Centers in the US equal the power usage of Michigan" it doesn't kind of gesture at a much larger amount of power being used.
With a headline like this, I'd always expect the 400 datacenters to be among the biggest, not a random sample (or the smallest, even). Why would any piece of media ever deliberately make their headline less "interesting" (sensationalist)?
Deceptive framing would've been: "5 datacenters use more electricity than Michigan" which could've still been technically correct assuming 5 datacenters the size of the currently unfinished AWS New Carlisle campus (2.3GW).
The point still stands that 400 of the gazillion datacenters in the US use more energy than the entire population and industry of an entire state. That's a ridiculous amount of energy to pour into any number of datacenters.
Its citing Hyperscaler Data Centers as 1.8% of the US's power usage, right? Sounds like Michigan just doesn't use that much power.
Why? Your objection sounds arbitrary.
Is it? What are you comparing it to? Someone upthread compared it to the top 10 steel plants and it turns out they use more energy than all the data centers.
This is like the water discussion where people discuss absolute values of consumption for huge scale industries and then put that in front of people that have no context to generate outrage.
Electricity is useful for so many things, but it's not needed in huge amounts in an ordinary Michigander's life today. I wish they'd switch to EVs and heat pumps though, but electric rates make the latter cost more (EVs are cheaper).
This says they are still viable:
https://michiganhvacauthority.com/michigan-heat-pump-conside...
Modern residential cold-climate air-source heat pumps can operate down to roughly −15°F to −25°F, depending on the model.
Michigan had an average of 4.6 nights per year reaching 0°F or below during 2020–2024
Unfortunately, the gas-fired turbines that are being built now feel like quite a regression. Or the additional load on the public grid, which in some places barely has any spare capacity left.
It's not an unsolvable problem though. A sustainable hyperscale datacenter can be built. There just isn't enough of an incentive as long as buying gas and polluting the air is cheaper (because the cost of both is externalized on society)
This is a misidentification of the problem. Generating power on-site with turbines is an alternative to bidding up the price of grid power that raises the short-term price of electricity for other consumers. If they're doing one they're not doing the other.
Moreover, small gas turbines and converted aircraft engines aren't actually the thing with the lowest long-term operating costs, they're just the thing you can plop out of a truck and turn on right away.
Which means the best thing might be to use turbines temporarily to avoid raising short-term electricity prices for ordinary people, but only for the time it takes to build some new non-carbon generation to replace them.
And the latter is what everybody really wants, because renewable energy isn't just cleaner, it's cheaper. It just takes longer to deploy, not least because the permits cost more and take longer than they ought to. Which means that if you really want to get rid of the turbines and the high electric bills, what you need is to make it faster to build new non-carbon generation.
They could also do neither and build carbon-free generation (and storage and transmission that goes along with it) from the get-go. That's what I'm arguing for. Not simply making grid operators deal with it.
I'd love to see some of that insane AI money be used to make actual progress towards net-zero emissions now.
> the best thing might be to use turbines temporarily to avoid raising short-term electricity prices for ordinary people, but only for the time it takes to build some new non-carbon generation to replace them
My fear is that some of these gas turbines aren't as temporary as they want people to believe. But even if we take their word for it, why spend money on a temporary solution and on a permanent solution later, even though we have the technology and supply chain to build the permanent solution now?
> renewable energy isn't just cleaner, it's cheaper
I agree that it's fundamentally cheaper, though some politicians seem to be dead set on skewing the market unfairly towards fossil fuels.
> It just takes longer to deploy, not least because the permits cost more and take longer than they ought to.
And I agree that delays due to permits are problematic, but I'd love to see AI money and momentum being used to overcome these hurdles. It shouldn't take longer from a technical perspective.
Right now, the voting public largely opposes datacenters being built at all, and that can hardly be the outcome we should strive for.
Instead, we should be building datacenters that are fully sustainable from the get-go and, if anything, have a positive effect on grid prices.
Rather than rejecting datacenter projects outright, let's push them to fulfill that goal for the benefit of all of us. Hundreds of billions of dollars from the AI hype should be enough to do it.
Then you need the permanent solution to be able to come online immediately so that you don't need a temporary solution, and that's the thing being held up by permits etc.
> Not simply making grid operators deal with it.
Dealing with it is literally the purpose of a grid operator. The place you want the consumer and the place you want the generator aren't necessarily the same place, which is the purpose of the grid. The grid operator then adds capacity according to expected demand. The long-term effect of higher demand tends to drive prices down because it improves economies of scale.
The short term problem is that the grid operator is subject to the same permitting delays etc. as anyone else, and then if demand increases it takes too long for supply to respond and in the meantime you get high prices.
> And I agree that delays due to permits are problematic, but I'd love to see AI money and momentum being used to overcome these hurdles.
This isn't so much a money problem as a policy problem. Renewable energy projects require pre-approval from NIMBYs when they shouldn't. To solve that you need to change the law. It's not a money problem unless you intend to use the money for bribery.
...they didn't use them for AI.
The panic over DC's has nothing to do with DC's. It's entirely about fear around AI and knee-capping AI progress. It's like when conservatives suddenly care about native grasshoppers when they find out a solar farm is gonna be put on the land. You're totally whiffing if you think they actually care about the grasshoppers.
And last of all, it's like 3 datacenters that keep coming up as "DCs are bad" despite their being thousands in the country (and hundreds of hyperscale sized ones).
The whole thing is public panic rather than academic honesty.
https://www.cso.ie/en/releasesandpublications/ep/p-dcmec/dat...
"Just the McDonaldses in New York City use more electricity than North Dakota"
But according to AI Multiple:
Globally, only about 22% to 27% of the actual electricity consumed by AI and data center facilities comes directly from renewable energy sources like solar, wind, and hydropower.
They recommend the obvious, "Prioritize inference efficiency over training efficiency" since most power is used for inference now.
They reference research that shows that over 80% of AI compute is now used for inference.
I don't see that referenced anywhere often enough in the AI datacenter swirling.
It's like saying mobile phones from the 1990's would never become more efficient, nor software, nor chips.
That's not to say there aren't more efficiency gains to be found, but the low-hanging fruit has been thoroughly picked.
There are lots of gains to be made on the software side, researchers don't pump out the most efficient code not on day one nor day 1000.
There are still discoveries being made on how the technology can be used, etc.
Do you really think this is at the height of as efficient as it will ever be? Or do we just know the most that we do at this time.
Your point is so basic it requires no expertise to reason about, however, anyways.
Lots of brochures have been printed though.
Every google now comes with an AI answer too.
Wired lede:
> Just 400 hyperscale data centers connected in the US used as much electricity as the state of Michigan in a single year, new Harvard research has found.
Harvard press release [0]:
> The study found that these HDCs, depending on how hard they were running, together used between 68 and 99 terawatt-hours of electricity—with the upper estimate approaching the amount some states, such as Indiana, Michigan, and Tennessee, use in a year.
Wired is playing in your faces.
[0] https://hsph.harvard.edu/news/hyperscale-data-centers-energy...
> HDC electricity demand was approximately 82 TWh, corresponding to about 1.8% of total US electricity consumption
(https://www.nature.com/articles/s41893-026-01985-7)
Sounds like Michigan just doesn't use much power...
Why Michigan instead of Maryland, Delaware, or Connecticut? Give the smaller states a chance!
even the expensive hardware has to be replaced every few years
Regarding the actual result, I’m appalled but not surprised (though obviously it’s good to have concrete data). We environmentalists having been raising this concern for at least a year. More people are catching on - this seems to have helped the Blue Wave this election season. But a lot of tech bros still don’t get it, particularly here on HN. Maybe this will help change some minds.
Google tells me Michigan uses 11–12 GW on average, and summer peaks reach roughly 22–24 GW.
In Alberta, companies have requested ~19.6 GW for only ~52 new datacenter's. O’Leary’s proposed off-grid Wonder Valley campus is pitched at 7.5 GW of generation on its own.
What do you mean "just"?
AI has only improved the lives of a few. Almost everyone else only sees bigger electricity bills, and AI features they don't want, and uncertainty about the future.
We're growing weary of the religion of technical progress as they mindlessly ruin our lives and never ask if a "progress" is actually good. You think we're keeping you from star trek, we think you're bringing us to societal collapse and a surveillance police state dystopia.
Useless rage baiting.