by jotux · 1w ago · 0 comments
Typical work would look like this:
A group would come to us and say, "We use these cards, but they wear out and we need like 200 more to keep running for 15 more years, we talked to primes about fixing this problem for us but they said the only thing they're willing to do is redesign the entire data handling infrastructure in the plane for $500M." So we'd get some tiny amount of money (like $200k) and redesign the card and make them ~20 prototypes. It'd work great, then they'd spend 3 years working on production contracts to try to get 200 built for $100k. In 3 years, some part would go obsolete, they'd come back and give us $50k to update the design and test, then start the 3 years cycle to buy 200 again. Rinse and repeat.
If they would have just given us like $30k, we already knew which parts were high risk of going obsolete, we could have just bought everything necessary to build 1000 units and dropped them in storage, but federal regulation limited what was possible. SUPER frustrating to have something that solves a problem and watch it fall apart over crappy policy.
It's sad to see this request, knowing that I was part of the team that designed a solution specifically to solve it, knowing it worked and tested it on the platform, but some part probably went obsolete and they never got enough manufactured to solve the problem permanently.
And you don't even want to think about which kindsbof products rely on this supply chain.
In a similar vein, with a product we DID produce for a helicopter: We had a tiny little specialized die that took a ridiculously soft stamped aluminum stick about ~0.04" square and turned it into a round stick threaded with some fine-pitch metric M1-point-something thread to connect a balancing weight. The die broke, and in trying to find a replacement I eventually ended up on the phone with another elderly man (who WAS retired) sitting in his living room reminiscing about his hyjinx with his dead best friend who had produced these incredibly specific die tools in his garage 30 years ago. (We ended up moving to a 2-step process, re-using and modifying the original threading die as a machining die to get the square part round, and then carefully using a roll-forming die. The part scrap rate increased precipitously.)
It's always fascinating to me how precarious some things in defense are.
Highlighting isolated examples of government waste (or outright lying about it) is eternal red meat for politicians/private sector special interests: the "Golden Fleece awards" [1] started by Sen. William Proxmire and taken up by Sen. Rand Paul are a notorious example.
Then to "fix" the issue we pile on even more counterproductive rules like OP's example or DOGE's weekly TPS reports which add even more wasteful bureaucracy, to somehow reduce government inefficiency.
Is this because they are worried about custody/security? Or a requirement that they actually be new?
Color of money: We typically had RDT&E funds that were specifically for research and development. We couldn't use those funds to buy components for procurement or operations and maintenance items.
Speculative stockpiling: It's just explicitly banned in the FAR.
Another big problem was the FAR is a gigantic mess of regulation that no one fully understands and it's interpreted differently by every agency. Sometimes the agency is casual with interpretations and will let you do certain things, sometimes they're terrified of getting anything wrong and ultra conservative. Because it's so large you can generally find regulations and clauses to support acceptance AND denial for a lot of actions. More often than not the only thing procurement people cared about was CYA, and they could always find something in the FAR that justified denial.
I can see their point, but comparing projects in the 1930's to those in 2026 seems a bit dishonest. The lack of work safety equipment and rules back then allowed these projects to move fast, ignore safety and build both the Hoover Dam and Empire State building in record time. They were not without casualties because of this. Even OSHA wasn't founded until the 1970's.
I wonder if there will ever be a good balance; or if the amount of regulation has permanently hamstrung large scale software and engineering projects from getting done on time and on budget.
Government didn't build the Empire State Building. It was financed by a private company called Empire State, Inc. that was backed by a bunch of Wall Street bankers and industrial titans. It was designed by Shreve, Lamb & Harmon, and the main contractor was Starrett Brothers and Eken. All private companies.
In a previous (but different job from discussed here) I worked at a large company that had had a stringent regulatory body with a "Industry-Wide Standards Board." The board had representatives from companies, including the one I worked for. They would regularly create internal efforts to capture regulation.
Example: They internally added requirements to all of their products that all communications on all data busses must be encrypted with a best-practices encryption standard. It took about a year of development to complete, and as soon as they were done they went to the board and demanded this critical security infrastructure be a requirement for all devices seeking certification. It was approved, and every other company had to start work to comply with it. It basically created a technical floor that small companies could never hope to reach.