by aresant · 13y ago · 0 comments
And who says that big government stifles entrepreneurial innovation?
If ALL Musk does with the Hyperloop announcement is shed more light on the potential debacle that is to be our $70b+ high-speed rail in California, we owe him a debt of gratitude.
PS - Direct link to the Hyperloop plans .PDF http://www.spacex.com/sites/spacex/files/hyperloop_alpha-201...
magic response: "of course we may be wrong, we'll look into this immediately." and then they decide to build it.
likely answer: praise, perhaps even an evaluation, then disregard as unrealistic a year from now.
why would "big government" ignore this idea? fairly simple: risky and unproven, for a politician, in a career where risk is not related to upside; and probably more important is the ability to control $70bn in spending to private citizens and contractors - far more valuable to their careers (leading to donations and influence) than spending a smaller amount (a mere $7bn) on fewer contractors. For the most part, the hyperloop contractors would not be the same guys who have been donating to politicians for the past decade in support of the train.
so yes, big government and the natural corruption of a large budget (donations->spending with favored constituents) will likely lead to the status quo - a ludicrously overpriced train.
as far as political repercussions, california is not a two party state any more, so there's no one to capitalize on the idiocy of the folks in power. i guess, we reap what we sow.
Influential people and money people and politicians are all going to read this and say Sounds great. Elon Musk? I'm listening. 7 Billion? Go on. And scientists are going to chime in, and universities, and people always forget the global reactions. Momentum.
I'm going to keep my faith that this idea has legs.
he is in bed with gov employees unions (the unions are primary driving force behind 200-300K/year gov employees pensions (http://www.mercurynews.com/salaries/pensions) with retirement age of 55, CA is something like $200B deep in that hole), and especially with prison guard union - of course huge prison population resulting from "toughness on crime" may not be viewed as government waste by some.
Building a bridge or high-speed rail to nowhere - just a [large] peanut in that picture.
200-300K/year (and higher) pensions are pretty much entirely executives who weren't union members, it has nothing to do with unions.
e.g., the #1 highest: http://articles.latimes.com/2010/dec/27/opinion/la-oe-cole-v...
what if the prison guard union got in on the contract to have the prisoners build the hyperloop?
Of course he's with the government employees unions, he has to live with them every day.
Politicians aren't all afraid to take risks, especially when they believe a particular policy they like will live on and be remembered.
Our former governor Jesse Ventura overcame incredible resistance and media scorn to get our first light rail line built. Almost all casual observers thought major health care reform was impossible in Washington. These things actually happened.
The key to passing a good policy is to reduce the risk. Politicians love projects where someone else was the guinea pig for them and/or someone else pays for studies and prototypes. Usually, they look for other units of government that have done something very similar with great success.
If I wanted to get Hyperloop to pass, I would first aim to table discussions on high speed rail for the proposed route. You would find allies among politicians who don't want to spend any money on transit, usually to appease highway contractors.
Secondly, I would immediately aim to seek R&D money for a high-profile demonstration project with plenty of funding for a study to project potential costs and impacts. This effort should even begin before the high speed rail bidding is tabled. I would leverage the demonstration results in the media and build a grassroots and lobbying organization around support for a Hyperloop.
Finally, I would seek advice from experts to craft a model bill with appropriate requirements for the bidding process.
http://ballotpedia.org/wiki/index.php/California_Proposition...
In fact, some of the highest resistance to the high-speed rail project that would run from L.A. to the Bay Area comes from Angelenos, according to new data released over the weekend by the USC Dornsife / Los Angeles Times Poll:
About 56 percent of would-be voters in L.A. County would say no to the train if allowed to vote on it again; 37 percent would be in favor. In San Francisco the train would win 47-45.
About 66 percent of Central Valley voters were opposed to the train, which would run through their farm region.
Statewide, if a re-vote on the train were allowed, 59 percent of would-be voters would say no; only 33 percent would give reaffirm it.
About 55 percent of statewide voters said they'd be down for a re-vote.
The article later goes on to state:
The biggest problem for this train is timing -- California is facing another crushing budget deficit and a stalling economic recovery. Dan Schnur, director of the poll:
Californians aren't necessarily against the idea of high-speed rail. But they don't want to spend all that money right now, and they don't trust the state to make the trains run on time.
[1] http://blogs.laweekly.com/informer/2012/06/california_bullet...
The only hope would be that the anti-rail side could point to the growth of projections as either incompetence or out of control budgeting, which could both sway the vote. But I think if you go back to 2008 and say, "This will cost $100 billion," the vote would be the same.
Edit: correction from dragonwriter, via wikipedia [1]:
"The cost of the initial San Francisco-to-Anaheim segment was originally estimated by the CHSRA to be $33 billion (2008) / $35.2 billion (2013), but a revised business plan released in November 2011 by the CHSRA put the cost at $65.4 billion (2010) / $68.9 billion (2013) / $98.5 billion (YOE). The latest plan has revised the costs down to $53.4 billion (2011) / $54.5 billion (2013) / $68.4 billion (YOE)."
[1] http://en.wikipedia.org/wiki/California_High-Speed_Rail#Fund...
And as I said in above comment, the $9.95 billion was for the initial bond issuance. The estimate on the ballot was $40 billion versus the current estimate of between $98.5 billion and $118 billion.
How about large scale funding of science and technology is an "engine of innovation", whatever that term means.
The Republicans haven't yet adapted to the people of the State taking away their ability to roadblock budgets from the minority, which is a crutch they'd come to rely on to avoid dealing with the difficulty of trying to build a minimum winning coalition in CA while at the same time toeing the line of the national party.
I'd be surprised though if they haven't started returning to being an effective opposition by the 2014 elections.
Not to mention safety. Nobody is going to just trust Musk to say it's safe. There will be a decade of trials to test it before it even gets green light approval for a small practically useable section.
Really? Because it looks like this is an attempt to derail CA HSR using a proposal for an experimental technology that offers a fraction of what CA HSR does, but is potentially faster.
CA HSR replaces/upgrades two metropolitan rail systems (Caltrain/Metrolink) in addition to connecting SF (as opposed to Oakland!) and LA, requires no R&D, is supposed to handle significantly greater ridership, has detailed cost estimates which include things like take into account electrification costs (because it does get cloudy), support facilities (because there is maintenance of these cars), administrative buildings (because someone has to run the system), bypassing/rebuilding overpasses (which are all over I-5) that are in the way and grading land.
Not to mention their estimates actually include going into downtown SF and LA, unlike Musk's $6B figure.
The East Bay (and even Oakland specifically) does not have a complete lack of moneyed NIMBYs. There are at least as many of those in the East Bay as in SF and the Peninsula.
And its actually a lot easier to "punch a line through" over land than over the Bay, and existing SF-Oakland transit capacity is fairly well saturated and expensive to expand (because, again, of the Bay).
You could maybe find some non-insane argument that extending Caltrain as conventional rail to San Francisco and running HSR to Oakland makes more sense than HSR to San Francisco and existing conventional rail to Oakland, but I doubt there's much case even for that; in any case, any sane strategy for rail is going to involve a fork with lines running up the Peninsula to SF and up into the East Bay separately.
But more to the point, it's costed through the straightest, least dense, cheapest part of a "SF to LA" route. It's shown with 3 km of tunnel west of Dublin and you'd need at least five times more to get to usefully located stations. This isn't how real infrastructure projects are estimated unless you're purposefully trying to arrive at a low cost estimate.
Oakland was chosen to make this thing look cheaper, not because it makes sense from a civil planning perspective.
Instead, I think of it this way... if it's so cheaply do-able, then - do it! Sounds like an easy money making idea if you can build it for the figures proposed. While you may only need to charge $20 each way to break even, why not charge double what it costs to go the next most fast, convenient way, and you would make bank! I mean, who wouldn't do this if it works as envisioned? It's a genius business plan, right!?
So do it! Some rich bold genius! Build us a hyperloop - so cheap and obvious and do-able! And whenever we get to HSR, we'll build it so it connects to the awesome LA-SF express hyperloop.
Yes, preventing a debacle is a win.
I've lived in China for over 3 years, and spend countless hours riding the HSR system. HSR combines the speed of a plane, with the cost and convenience of a regular bus. Traveling through the countryside of China at 380km/h made me feel like I was in the future. Coming home and seeing the the sad state of our infrastructure was a harsh reality check.
Granted China has a massive manufacturing/mining complex and cheap labor. But if we hadn't squandered 5 Trillion on "War on Terror" and domestic spying, I'm sure we could kept our lead in infrastructure and still has some left over to boost education / R&D spending.
In the past 20 years China's moved their mountain. Hopefully the hyperloop will help us to catch up.
Sadly, I think the first place a Hyperloop will be built is China. Chances are there are engineers there looking it over now, and figuring they can knock out a test system in a year or two.
The problem with CAHSR isn't the "HSR" part, it's California's utterly dysfunctional political system, and going faster and putting the track up on pylons isn't going to cut through that morass without a stronger group of people standing up and saying YES, WE NEED THIS.
It's mind boggling to me that the California HSR isn't being built from DC to Boston instead.
Upgraded high-speed rail in the Northeast corridor (where the US's only existing HSR is located) is being planned. [1] California HSR being built in California doesn't preclude HSR from being built/upgraded in other parts of the US.
[1] http://en.wikipedia.org/wiki/High-speed_rail_in_the_United_S...
The difference is, we already have the Acela, so it just needs a speed upgrade.
Boston (4.5M metro area) New York (8-20M depending on how far you stretch the metro area) Philadelphia (6M metro area) Washington D.C. (5.7M metro area)
It seems pretty clear that California needs it and generally HSR is a pretty sensible infrastructure investment.
That said like you I would love to see a superior alternative to the current situation but CA HSR is probably not it.
Edit: added some references
http://www.mercurynews.com/top-stories/ci_15746975
http://www.fresnobee.com/2013/08/01/3419259/high-speed-rail-...
http://www.latimes.com/news/opinion/opinion-la/la-ol-califor...
The main cost of CAHSR will be the opportunity cost of not having built it.
I wonder: this is from an LA Weekly article from 2011 -- I remember it being an eye-opener when I read it back then [1]:
The authority had projected that 41 million people annually would ride the train between Anaheim and San Francisco, for example. But currently only 12 million customers fly nonstop on the extremely busy air route between Los Angeles and San Francisco each year.
The article goes on to say that Acela gets 3 million riders in the very dense east coast NY/Washington corridor but in less-dense California they were projecting a ridership around 10x of Acela's (!).
The LA Weekly has had a bunch of articles about the project over the years criticizing everything from its cost to its leadership to its utility. If the picture they paint is mostly correct, perhaps the only way to win is not to play.
And it's not just the LA Weekly -- a third party independent review came to similar conclusions apparently, as described in this LA Weekly article from Jan. 2012 [2]:
On top of skepticism from the state auditor, inspector general and legislative analyst -- as well as university researchers, federal transportation experts and this very news blog -- a "peer review group" for the California High-Speed Rail Authority, formed for the sole purpose of independent review, has declared the project neither physically nor financially feasible at this time.
The train's roster of supporters tells us everything we need to know:
"The project has won major support from organized labor, some big-city mayors and many state lawmakers," reports the Los Angeles Times today.
The article quotes the following from the report:
"We cannot overemphasize the fact that moving ahead on the HSR project without credible sources of adequate funding, without a definitive business model, without a strategy to maximize the independent utility and value to the State, and without the appropriate management resources, represents an immense financial risk on the part of the state of California."
[1] http://www.laweekly.com/2011-11-24/news/100-billion-bullet-t...
[2] http://blogs.laweekly.com/informer/2012/01/california_bullet...
I don't believe that high speed rail will necessarily be a debacle.
But the route was largely chosen for political considerations. It was decided downtown San Jose, Fresno, and Bakersfield must have stations. (This requires an additional long tunnel, and urban construction is much more expensive.) The route takes a detour through Palmdale[1], an underdeveloped part of Los Angeles County.
The 'straight shot' route down I-5 that Musk proposes was also considered for HSR, and rejected even though it would have been much cheaper and simpler to construct.
However, CA-HSR chose the nearly the most complex and expensive route possible (even though they don't have a funding source), so we shouldn't make a direct cost comparison with Musk's route down I-5. HSR would also be much cheaper on the mostly unpopulated I-5 corridor. Also, the right-of-ways that Musk proposes to get into SF and LA are sketchy.
(Silicon Valley business interests wanted the HSR stations in San Jose & Mountain View, and apparently quite interested in using lower-cost areas such as Fresno for back-office activities. So while they will be impressed by Hyperloop's techno-wizardry, they may actually prefer the HSR project.)
California has a very large amount of regulatory burden compared to almost anywhere else in the US. High speed rail there is likely to cost overrun by a massive factor, and under deliver by a massive factor, and both, for no actually good reason, instead, only theoretically good ones.
SPUR's data comes from the SF planning department, which is now under tremendous pressure to at least claim they are doing something. Data on the actual ground (IE real estate listings, etc) do not support their claims, as anyone who tries to get a residential unit in SF can tell you. I'd love to know what they consider a "start". It shouldn't take multiple years for a simple residential unit to be completed.
You are also talking about places where it takes months to get a tree removed from your property and requires approval from the "county arborist". It often takes years for people to acquire permits to do remodeling.
California also has significantly different and more stringent energy/building codes from all other places, in areas completely unrelated to things like 'earthquake protection' (or anything reasonably related to California issues)
It absolutely has a high regulatory cost compared to most other places, and past HN, i don't think i've seen anyone dispute this (IE AFAIK, California doesn't dispute it, they simply claim it's worth it)
If you can afford to rent a car at the end of your train ride, you can afford a plane ticket.
In my opinion, most likely, the CA rail proposal is just a political folly being undertaken by corruptocrats who have ideas to profit from it.
Yes, the rail would be useful for poor people who want to visit family, but that is not a business case, and does not justify harvesting tens of billions from the innocent citizens of CA. (Even if a tyranny of the majority voted to do it.)
Which is one reason a not-insignificant part of the HSR plan in California is improving commuter rail and other connecting mass-transit systems that will interface with HSR, to reduce exactly that problem.
"A brilliant exploration of new ideas in business argues that government is behind the boldest risks and biggest breakthroughs"
http://www.ft.com/intl/cms/s/2/32ba9b92-efd4-11e2-a237-00144...
I don't have much of an opinion on this topic, since it seems to me that any large concentration of money and smart people produces innovation (so do lone geniuses). But I thought this article was interesting.
What do most of us in the general public really know about how projects like the high speed rail get on the ballot. A lot of people have their suspicions, but we have to ask ourselves if there was a competitive bid process to determine the best solution.
I, for one, would have voted to throw money into future technologies over current rail solutions. Mostly because I shudder to think how much current tech will be old news in ten years when the high speed rail is completed (if at all).
If we pursue the hyperloop or similar tech, and whether it can be completed or not, at least it would be a first of it's kind and on the cutting edge.
We would owe a debt of gratitude to a hypothetical public transport project for helping to obstruct or kill a real public transport project?
Maybe I'm naive... or maybe Musk for all his genius is focused on the Government grants too much instead of being focused on the investors in the business world.
If this brings profit, everybody want to own piece of the pie, no?
(2) A CA-sponsored bond issue must be by far the lowest cost way to finance a $7B infrastructure project that's amortized over 30 years.
It's called a "public-private partnership" and it's not completely impossible but it does require some person or persons to cough up the cash.
Because you can't, in practice, acquire the rights of way necessary to build a substantial railroad/hyperloop/freeway or other major infrastructure project of that type without government (specifically, without use of eminent domain).
few investors would touch this. It doesn't fit into any investment category that's approved.
There are infrastructure funds but they're looking for sleepy assets. Stuff like toll roads and ports that have an established operating history and are supposed to be low risk.
This is a whole different animal. It's almost infrastructure VC. I don't see how this fits in any part of the institutional world. That leaves wealthy individuals and I don't think there'd be a lot of interest there. They're looking at Berkshire and steady growth vs. an investment in speculative infrastructure. I could see $10M investments but I think it'd be hard to get people to put a big chuck of their net worth into it, which is what you need (i.e. you need a couple people putting in $1-2B). Furthermore, historically public transportation hasn't been very profitable. Realistically you probably need the state to build it.
If you're traveling at 600 mph, you do not want to have that tunnel unexpectedly move even a foot sideways during an earthquake.
Compare what would have happened if Tesla needed to raise $500m from private investment at the start. Musk would have been diluted up front.
Or just have Jobs resurrected. This way we save $1B on the "fees" and he'll talk the Government officials into this for free. They'll think they get the best deal in the world once Steve is done talking to them and the Distortion Field is permanently present in the Government heads.
Someone get me his phone number right this moment.
When you consider the growth in air travel, and the fuel options for air travel, the Hyperloop IS effectively a low emission energy source. I suspect he's more than interested.