by rsync · 13y ago · 0 comments
As opposed to 220 mph top speed in the year 2029 for california "high speed" rail.
What a bright, wondrous future we will all be living in!
I think California's high speed rail project should be cancelled, but big infrastructure projects do cost a lot of money and take a long time, both in Japan and the US.
My main issue is the way they are going about it, which is a highly politicized construction process along with some really out-of-order prioritization.
It would be much better to start with the low hanging fruit, like grade separation and electrification of Caltrain. That line would benefit immensely from some major upgrades, such as longer station platforms. To be fair, the most recent round of upgrades (ctc, quadruple track sections, new rolling stock) have been very well done.
According to the WSJ, 6 million people per year travel between LA & SF via air every year. I can't find highway numbers, but I gotta believe it's about the same order of magnitude, if not higher.
Improve BART, VTA light rail and CalTrain (in the Bay Area), and I suspect it will have a much larger positive impact on the lives of more people.
All of the above need to be done, both will have a positive impact of even more people.
CA HSR authority signed a construction contract with Tutor Perini to start construction in the coming weeks. It's happening.
* In the meantime, projects like the Southeastern High Speed Rail Corridor [..] will be starved of funds.*
This isn't an either/or situation, we can (and are) doing both.
The portions that must be worked on first is the crossing of the Tehachapi mountains, as it is the most time consuming portion. Yet instead, they are constructing line in the southern Central Valley.
I agree with the pessimists. Much as I want high speed rail, I doubt it will happen.
The other important thing would be more and better business class cars at a fair price. Business class should have strictly enforced quiet, be spotlessly clean, with totally reliable internet access.