All of this is true, but the lights are still on, and the T1 line is still piped into their building (not confirmed by visual evidence but it would cost more to shut it down and restart it barring a crisis causing shutdown >1month). Either they think the shutdown is lasting a while or their CTO/CWhateverO has a sense of humor.