by spligak · 12y ago · 0 comments
Enemy #1 in a large data center is power. When he mentioned the entire rack pulls 1,000W for the density suspected in this thread (~500TB to ~1PB), that piqued my interest. Even if you can't push 2-3PB per rack, the top stat you're crunching forever and always is watt-per-gigabyte. Space is important but if it breaks into the top spot you've done something else wrong along the way.
Enemy #27 for cold(ish) storage might be, say, pressure per sq. in. on your floor. I'd be interested to see a weight comparison of a fully-loaded LTO/cartridge rack and this design.
Perhaps not what you were looking for in an answer, but I'm interested to look over the schematics.
No comments yet.