The need to stagger the power on of the two supplies poses a problem. What if power to a data center is lost? When power is restored, all box will try to start, blowing all fuses. Granted, this is a catastrophic event, so its frequency should be very low. But, this also seems like an area that could be automated.
some of the more expensive managed power supplies also support a staggered power on after power fail. But I don't worry about it; only using 75% of the power circuit solves that problem for me.
Addressing this would require a little bit of design, but the problem is relatively simple. If they wanted to get fancy, they could add a chaining feature--pods on the same circuit would be connected together so that they'd power on serially. This would get away from their goal of using off-the-shelf parts. It is, as with many things, an engineering trade-off.
from there it would be easy enough to have an automated process turn on servers one at a time.