by toomuchtodo · 11y ago · 0 comments
He's just commission 2-4 TBMs (tunnel boring machines, about ~$20MM/each), drop them in the ground, and have them start digging hyperloop tunnels.
Part of Elon's design for the pylons allows the track to remain stable even when the pylons are moved by an earthquake. Which is kind of important with pods moving around Mach 1. Doing the same thing with a tunnel requires you to have cut a large enough hole to shift the tube inside of. Which is a massively harder piece of engineering.
As with everything, there are tradeoffs. Building above ground means land use issues, and the tunnel needs to be so small you can't stand in the hyperloop pods. Building underground means more support infrastructure, but you're limited less by politics and land use problems and more by engineering.
The questions is: which is cheaper to solve? Engineering? Or politics?
Take the 1906 earthquake as an example. As http://pubs.usgs.gov/gip/earthq3/move.html says, the horizontal slip was 21 feet at one point. Something like the Hyperloop has to be designed with the expectation of facing a similar event. Concrete is simply not strong enough to hold back a wall of dirt trying to move 21 feet.
Or for more recent history https://catalog.data.gov/dataset/landers-and-big-bear-califo... where the slip was 18 feet horizontally and 6 feet vertically. And that one demonstrates that it isn't enough to build something special for every slip zone you know about. Because in a real earthquake you are likely to discover slip zones that nobody noticed.
Why does the possibility of an offset result in a tunnel being an "emphatic no" while still allowing for this pylon idea?
http://www.bbc.com/future/story/20150602-crossrail-the-monst...
$250 million for a water tunnel that goes 3km. It's simpler than a hyper loop tunnel.
Also I'm not sure Crossrail is a good counter example. That's a 30 billion dollar project to go 73 miles. Saying the TBM cost $20 million is like quoting the cost of a truck without including the price of the driver or diesel fuel.
Anyways, the cost of a TBM is generally not the most expensive part of a tunneling operation.
What is the most expensive part?