I've been seeing things the exact same way. There are those that want the end product as fast as possible and there are those that love the process and the struggle of getting there. The former group is the ones telling the latter group that they'll be left behind.
Can someone explain what triggers a note? I don't understand from the explanation on the site. Is it whenever a train on the line crosses a predetermined geo-location?
What do the technical details look like behind this to get the data?