Better HN
topnewbestaskshowjobs
Log inSign up

Patrick-STH

233 karma · joined Feb 18, 2016 (10y ago) · 47 submissions

Submissions

comment 2y ago · link · parent

There is not an EPYC 7xx4. EPYC 8004 is Siena. We reviewed an ASRock Rack Siena platform this week actually.

We had this in the Genoa launch piece but AMD largely kept $/core constant between Milan and Genoa. Milan is still being sold since it uses cheaper PCIe Gen4 motherboards and DDR4.

On the server side it takes a few quarters for new products to start making up the majority of shipments. These days it is better to think of new servers as N, N-1, and still some N-2 generations being sold as new.

comment 2y ago · link · parent

Yea, it looks better for when we put it on screen in videos though.

comment 2y ago · link · parent

Easy one would be the P part is single socket only.

I was browsing one day looking for barebones to throw in one of our clusters and saw Newegg was selling these 1U servers cheap ($2200-2300)

Usually with AMD desktop and server CPUs buying high core counts at lower TDP yields a great perf/ W figure

comment 2y ago · link · parent

We bought Newegg out of all the new Tyan systems they had in stock. I was hoping to do a piece on them, but they must have had few in inventory

comment 3y ago · link · parent

Good one. These presentations are like 30 min each so it is hard to stay on top of all of them.

comment 3y ago · link · parent

Thanks. We will have more in a bit, and may not get to all of them. I was talking to lots of folks that came to say hi today. Trying to get at least a good portion of these done this week.

comment 3y ago · link · parent

I am not going ot post our own links, but last week we did the UM790 and we have the GTR7 Pro review coming as well.

comment 3y ago · link · parent

Yes. I think that is a solid NUC alternative with one exception: the lack of USB4/ Thunderbolt as standard. Intel was very good about including TB on its NUC line and also did a better job upgrading to 2.5GbE.

comment 3y ago · link · parent

Yes. We have done pieces on the BlueField-2 DPUs running Ubuntu and doing things like running ZFS and iSCSI off of the DPU's Arm cores as well. This is the BlueField-3 base, so a faster Arm core complex and more memory bandwidth.

comment 3y ago · link · parent

Sometimes 2-3 tries but that is also from pacing. I usually have my laptop out to reference quickly but no prompter. People can tell when I read from one, so I have just had to get comfortable without reading.

comment 3y ago · link · parent

We are going to have a Dell PowerEdge review tomorrow. We call that a server or more than one servers not server units so that would feel strange to me.

comment 3y ago · link · parent

Well that was the part number for the NVMe expansion kit. TBH that is one of the hardest things about doing server reviews on YouTube... The model names

comment 3y ago · link · parent

It is hard to title since they are stopping servers, but not server CPUs.

comment 3y ago · link · parent

This is servers, the systems like Dell, Supermicro, and others sell, not server CPUs (aka Xeons)

comment 3y ago · link · parent

That is why I said servers not Xeon or chip. I was not sure how else to describe it other than servers since that is what is being sold.

comment 3y ago · link · parent

Hi!

comment 3y ago · link · parent

Later in 2023. We will cover it like we did with Milan-X.

comment 3y ago · link · parent

Now that is a throwback! That old logo was created with GIMP at a table outside NetApp. STH started at a time when the SMB market (and VERY high-end homes) were using Dell, HP, and IBM rackmount gear off-lease. The original STH idea came from me learning Linux as an alternative to Windows for that segment. STH was what I used to learn the rest of the market outside of work. The first product we were sent for a review was a rackmount case and that started us on the path of reviewing new gear ~2010-2011 when it was a part time blog instead of having a team of folks working on the site. I still try to keep 15-20% of our content in the SMB/ high-end home arena.

comment 3y ago · link · parent

The MI300 will compete more with Grace Hopper than with the H100 SXM5. We will be covering and showing both later this year.

comment 3y ago · link · parent

It is in the "About" page :-)

I always get confused by why folks ask why we have server content. The Wall Street Journal covers more than just one road in NYC.

comment 3y ago · link · parent

STH has been around for 14 years and so we have tested these big servers from the P100 days (see our DeepLearning12 build) and newer. Home was the /home/ directory in Linux.

We do have some content for homes. Check out our TinyMiniMicro series as an example.

comment 3y ago · link · parent

Good catch. Fixed

comment 3y ago · link · parent

There are a few big ones: - The CUDA license does not allow you to use GeForce in the data center. In the US it has become less popular, but if you look at our Inspur AIStation piece, that was a cluster located in China with GeForce cards. So it still happens, but less so. - The memory capacity is another big challenge. Newer models have 80GB which dwarfs the 24GB on a 4090. We just got the RTX 6000 Ada in, so that is an option for more memory. - For higher-end training, one of the big challenges is interconnect, so having NVLink and Infiniband or 100GbE+/ Infiniband NICs is important. The HGX A100 platform is designed for that with its NVSwitch and PCIe switch topology.

With all of that said, you are 100% right that many startups have used consumer cards for years. For example, Andrej Karpathy talked about how our DeepLearning11 build (8x 1080 Ti's) had a ~3 month payback period versus AWS https://twitter.com/karpathy/status/924340245478256640

comment 4y ago · link · parent

This is a crazy oversimplification, but let me take a shot. The difference to others is easily a large "novel size" discussion.

Most training SoCs are focused on building something the size of an NVIDIA GPU, but designed for ML versus general purpose GPU HPC compute (FP64) plus ML. Often those accelerators today have a few types of models they are optimized for. NVIDIA is the baseline and so the competitors are looking for areas where they can get a large boost at a lower cost with something about the size of a A100/H100.

Cerebras is perhaps the biggest exception with its WSE-2, a wafer size chip. Having the wafer size chip means that Cerebras does not need to go into higher-latency and higher-power off-package interconnect as frequently because its chip is 50x larger. In turn, Cerebras drives performance and cost savings by not needing NVLink4 NVSwitches / InfiniBand.

Tesla's Dojo Tile is 25 chips roughly equivalent in size to a NVIDIA GPU in a single package with die-to-die communication facilitated by the base tile and then built for scale up units. Tesla also has focused on the interconnect and pipeline feeding the D1s and Tiles.

Ultimately, I think that it takes something beyond a "solution X saves 30% over NVIDIA in these workloads in performance/ $" to survive. NVIDIA has a massive software ecosystem and can handle more types of tasks versus some of the other AI accelerators. That goes beyond just the training and also to other parts of the data prep and movement pipeline. NVIDIA extracts high margins from this work so that is why some effectively are competing with "it costs less and on some problems can be faster" architectures but what Tesla, Cerebras, Google, and a few others have another level of differentiation.

Nothing is perfect, nor was that explanation, but just a high-level view of why the technology featured is impactful.

comment 4y ago · link · parent

That one was an eye opener for me too.

comment 5y ago · link · parent

Totally correct. I mention that a bit in the video as well. Also - I do not view this as an AWS v. Colo. We use AWS for some services as well so it is a specific part of the workload we run (not just WP) that is in our hosting cluster.

And again, this is a fraction of what we have in data cetners due to the labs and such.

comment 5y ago · link · parent

Very little, but that is probably because we cover the server industry in-depth with reviews and such. I mentioned a bit that that knowledge is key. This is our cost analysis and not going to be the same for everyone.

comment 5y ago · link · parent

That may be true. We grow 20-30% Y/Y which is not as big as many other places (but is more than most others in our space.) 20-30% growth we handle with refresh cycles since we have extra capacity.

comment 5y ago · link · parent

100%. We had 11 months where nobody touched the racks as an example and the visit 11 months later was the one to physically get a tool I had left there. I mentioned I even track drive time.

comment 5y ago · link · parent

We include in our "Hardware Costs" having extra node and spares. For example, we keep a full spare node in the DC as well as spares.
12