Of course there's blame on the engineering side of the table too. We chronically underestimate effort, not adding enough margin for unknown-unknowns. So we start working late. Sandbagging estimates. Telling the PM whatever he wants to hear just to end the meeting and get back to work.
Impossible schedules are toxic for people that care, and encourage apathy as a coping mechanism. If you put in a Herculean effort and ship on time you did what you said you were going to do, what, do you think you deserve a cookie or something? The other option is failure. Even if the PM or management isn't upset, engineers still feel the failure of not hitting a goal.
Engineers need to feel wins. Always shipping late because of impossible schedules means no project is a win, no matter how good the design is.
At a former job I found out after a couple years that impossible schedules was a business strategy by the c-level execs. It encourages engineers to work as 'efficiently' (i.e. as much) as possible. God forbid we clock out early because we're not stressed out about being behind. Learning that made me shift from caring to apathy. I left shortly after, but I wish I had stayed a bit longer, it might've been nice to have a job that I didn't care about so I could focus on other areas of my life.