15 karma · joined Apr 23, 2016 (10y ago) · 7 submissions
comment 3y ago · link · parent
E.g. 1 ms slice with 1 core = 1000 process switches per second. With 2 cores you can increase the slice to 2 ms and still maintain the same number of switches per second for the system, but reducing the switches per second on each core to 500. This reduces the overhead for the scheduler.
It seems like at around 8 times the slice efficiency starts to go the other way, so they’ve limited it. Seems reasonable, but scheduler math is crazy.
Note, that this has nothing to do with the scheduler assignments per core which have clearly been working or people would’ve noticed!
comment 3y ago · link · parent
Regardless, overriding a socket parameter like this should be well documented by Golang if that's the desired intent.