by MauranKilom · 8y ago · 0 comments
For reference, a common electricity mix currently generates about 0.5 tons of CO2 per MWh [0][1].
Now, for the device in question: Creating 1 ton of cement releases about 1 ton of CO2 [2]. A common ratio of cement per mass of concrete is maybe 1/5 [4]. The article says they found a way to reduce that to a sixth, so we are at about 1/30 of the concrete mass in cement. From the article, each block weighs 35 tons. So we'll just assume 1 ton of cement (and CO2) per block.
The graphic in the article shows ~40 layers of no more than 20x6 concrete blocks can be stacked around the tower, each weighing 35 tons. Therefore, each such installation would cost about 5000 tons of cement or CO2.
So its building cost in cement alone is the equivalent of 10000 MWh. Fully "charged", it stores 20 MWh. It would therefore have to complete 500 full cycles of taking energy available for free (and otherwise lost) and feed it back. Roughly assuming it can do that every week (no idea, really depends), that would be ten years to become CO2 neutral, just in terms of cement. So there's your reference value.
However, I haven't seen this kind of calculation for other energy sources. That would be interesting.
Edit: Here is a review of CO2 from lithium-ion batteries: https://www.ivl.se/download/18.5922281715bdaebede9559/149604...
They say 150-200 tons of CO2-equivalent (!) per MWh stored, which is very close to the device in the article (in the above estimate it would be 250 tons of CO2 per MWh, although I did not check whether that is pure or CO2 equivalent).
[0] https://www.eia.gov/electricity/state/ (randomly sampled some states)
[1] https://www.umweltbundesamt.de/sites/default/files/medien/37... (German statistics)
[2] https://blogs.ei.columbia.edu/2012/05/09/emissions-from-the-...
The thing i ponder about this is the foundations needed for a setup. Concrete stacks very well (think dams) but you need very strong foundations for tall, solid concrete structures.
From [2]:
Cement manufacturing is highly energy- and emissions-intensive because of the extreme heat required to produce it. Producing a ton of cement requires 4.7 million BTU of energy, equivalent to about 400 pounds of coal, and generates nearly a ton of CO2. Given its high emissions and critical importance to society, cement is an obvious place to look to reduce greenhouse gas emissions.
Ignoring the geographical problems, could using the power source from which energy is stored for these devices also be used to manufacture the concrete, or would you be constrained by the power plants ability to output enough energy intensity to produce concrete?
If feasible to do, then for the geography issue, would the CO2 output from lengthening the trucking route and/or high voltage transmission lines to the storage site possibly overcome the cement issue overall? If the power is ~free, loss in transmission is less important, but then you have to consider the output of manufacturing and installing transmission lines also. Although, perhaps there's spare capacity on some lines.
Actually, once the blocks are manufactured, you can ship them anywhere.
Complicated.
But you won't want to, because they're insanely heavy. At 35 tons a semi-trailer can only carry one.
You really need to build these on-site. The amount of diesel you'd burn to move them long distance is astronomical.
I know nothing about the cement business, so it's hard to have even a clue how to estimate this, even if you consider the power to be ~free..
Goodness, this doesn't seem viable at all.
Could the system work with pallets of steel drums filled with water? It looks like 4 layers is usually the height limit.
Does it depend on height to be effective, or could it stack limestone just 30' up or so?
[1] https://en.wikipedia.org/wiki/Cement_kiln#Carbon_dioxide