For batteries it tends to be multiple of the battery cell voltages. So 48v is probably so you could wire 4x12v batteries in series but that is a guess. With tool voltages this tends to be a multiple of the nominal battery voltage (rounded for marketing).

comment 6y ago · link · parent

Something is very amiss with the QLD data. A better site for exploring composition of generation is https://opennem.org.au/energy/qld1/. That said, the result is about right for CO2 intensity, if a bit high.

Also the market operator has their own data for CO2 intensity https://aemo.com.au/en/energy-systems/electricity/national-e... . General comment - Victoria tends to have the worst electricity supply in Australia in terms of CO2 per kWh (brown coal vs black coal elsewhere)

comment 7y ago · link · parent

Concrete setting times depend on ambient temperature. Too cold and concrete takes longer to achieve the necessary strength to start the next level. Admixtures and other techniques can improve this.

So the claim for taking less time than a _concrete_ building is plausible for this location (I assume it's pretty cold compared with other climates). However like you mentioned, a _steel framed_ building would be similar in build time, since the elements can be hoisted and joined in the same way as a CLT building.

But that also depends what your slabs are. Most steel framed buildings use concrete slabs, which need to be poured and set, but with high early strength concrete and propping, this takes less time than a conventionally formed concrete building.

Concrete buildings can go up really fast, I've seen 5-6 day cycles on jobs. It depends on the complexity of the structure and again the ambient temperature (among other things). So yes concrete can go up faster than CLT as you noted.

As an interesting side note, the article mentions that the top floors of this CLT building use concrete for mass to limit swaying.

comment 8y ago · link · parent

Worth pointing out that if you're patient with setting times, you can use portland cement substitutes (fly ash, ground blast furnace slag) as a substitute for portland cement. Slower strength times (several days longer) but same long term strength and way lower embodied carbon.

The thing i ponder about this is the foundations needed for a setup. Concrete stacks very well (think dams) but you need very strong foundations for tall, solid concrete structures.