by Mvandenbergh · 3mo ago · 0 comments
That could have been prevented by simply not permitting connections in certain parts of the network. Yes, theoretically it could also have been prevented by forcing generators to directly bear re-dispatch costs which would have led developers to build a different set of generating assets. This would have been a different set of market mechanisms.
However, if generation decisions had been made centrally, they would have been made by the same system operators, regulators, and governments that mandated the construction of the current system and they would have therefore built the same system more or less. Do you really think that if e.g. Germany or the GB network had been centrally planned by their respective government mandated regulators and system operators, they wouldn't have put all those windfarms exactly where the market-led model we actually have has put them?
You don't seem to understand what's driving the so-called re-dispatch costs in Germany so let me explain: when there's power consumption in the South, it is paid at the market price, when the "supplier" is located in the North (typically wind) and there's not enough network capacity to transfer the power to the consumer, the transport authority sends an order to the supplier not to produce the electricity, and instead pays a thermal power plant in the South (at a higher price than market price, by definition) to provide it instead.
That's not a problem of physical realities driving constraints, that's the problem of a market that uses a very simplified model that simply can't deal with the complexity of the underlying phenomenon (we don't even have enough computing power to accurately model the electricity transport at national scale given how challenging the equations are, and even the lineralized version that are being used in practice are already very compute-intensive, it's entirely futile to expect to build a market that can efficiently reflect them).
The issue is that the physical reality of the network and the location of generators and loads is fixed at time of [re-]dispatch. Regardless of how you reconfigure the dispatch mechanism, there is energy that cannot be moved through the network from the wind in the North to the load centres in the South. The only way to avoid that physical reality is to either massively increase the N-S transmission capacity or to put generation capacity closer to load.
Once these generators have been placed where they are and pending extremely challenging network expansion being realised, it will always be the case that some party or set of parties bears the cost of the constraint.
If you moved the ownership and control of the transmission network and all generators into a single operator that was responsible for optimising its operation in near-real-time and that bore all the costs within a single accounting perimeter, it would do more or less what the the existing market based mechanism does: turn off the wind generators and instruct the thermal plants in the South to run instead.
Yes, it's true that in that case there would not be a "market price" paid to wind turbines that actually cannot run, nor would there be a higher re-dispatch price paid to the thermal generator. However the total system cost would still be the same. Even though the wind turbines would "lose" money because they can't run and the thermal plant wouldn't receive its market price for relieving the congestion.
Of course you could argue that this efficient single operator simply wouldn't have built the wind assets in the first place in a location where they often couldn't run but that assumes that the same policy makers who created the current outcome wouldn't have engineered the exact same outcome through the direct control they presumably would have had of the integrated operator. I will note that many American utilities actually are vertically integrated like this (banned in the EU under the Third Energy Package) and they build in the exact same pattern and bear the constraint costs internally.
But it wouldn't count a profit in the North and build yet another pointless wind turbine in the North. Whereas the current system, because it pays the Northern producer the market rate, for electricity that isn't needed, shape the grid in a nonsensical way! That's the core of the criticism.
> Of course you could argue that this efficient single operator simply wouldn't have built the wind assets in the first place in a location where they often couldn't run but that assumes that the same policy makers who created the current outcome wouldn't have engineered the exact same outcome through the direct control they presumably would have had of the integrated operator.
There's literally no reason to assume they would have done the same choice given they would have responded to completely different incentives (minimizing the total cost, instead of individual actors maximizing their profit under the artificial price scheme).
They did so for political and ideological reasons that I think are pretty clear to anyone who follows European politics.
Had those same political stakeholders had more direct executive control of a single national electricity system, they would have done the same thing and for the same reasons.
Yes, of course a vertically integrated system optimising for efficiency would never have made these choices but the same political decision makers who shut down Germany's nuclear fleet would never have permitted such an integrated system to operate in such an efficient way if it meant not building wind assets.
We can see the impact of a different political direction in the French electricity system, which despite being structurally similar to the decision making of the German system is in practice much more centrally directed and which despite absurd attempts to sabotage it from within France and within the EC continues to operate in a much more optimal way.
It doesn't do this through formal centralisation and integration but by the careful design of grid codes and subsidy regimes to avoid these absurdities.
And of course it's a market design issue, but as I said above, the problem is that you'll always face market design issues because the market designers face an impossible problem: you want to use a simple enough model and you're modeling an insanely complex problem for which any discrepancy between the model and reality will result in a catastrophic failure unless you have a central authority there to patch the holes.
At the end of the day, it's always going to be a centrally-managed system (because you cannot afford blackouts) but with the central planner merely swallowing the cost of the economic inefficiency rather than preventing it.
Suppose a new generator wants to know which is the best node to interconnect to. This should be obvious from nodal pricing, as you would simply check the node that has the highest INC redispatch/lowest congestion costs (the nodes in the south of Germany in your example). Similarly, the worst node to connect to will be the one with the highest DEC redispatch/highest congestion costs (the North). Instead, in the current german system, I would think you would need to do some contrived thing of figuring out which generators are getting the highest uplift payments, but this would be very imperfect as you would not know how sensitive a different node would be to the system redispatch (not to mention, this is assuming this information is even readily published).
There’s really no excuse to not adopt nodal pricing over whatever exists for a centrally planned grid operator. I can only really imagine it’s a political issue.
This is a huge "it depends", because we are then comparing a partly-political system with a fully-political system. The privatized model builds at the optimal locations for getting paid under the prevailing rules; the state one is much more prone to getting distracted by lobby groups. See the German over-dependence on coal and the UK conservative ban on onshore wind farms.
I will be interested to see how the deployment of affordable battery storage changes the economics. I've also seen a striking presentation about how much renewables the UK plans to deploy (roughly double!) by 2030. More on the strategy: https://www.gov.uk/government/publications/clean-power-2030-...
"Clean Power means that by 2030, Great Britain will generate enough clean power to meet our total annual electricity demand, backed up by unabated gas supply to be used only when essential."
(note details of wording)