Suppose a new generator wants to know which is the best node to interconnect to. This should be obvious from nodal pricing, as you would simply check the node that has the highest INC redispatch/lowest congestion costs (the nodes in the south of Germany in your example). Similarly, the worst node to connect to will be the one with the highest DEC redispatch/highest congestion costs (the North). Instead, in the current german system, I would think you would need to do some contrived thing of figuring out which generators are getting the highest uplift payments, but this would be very imperfect as you would not know how sensitive a different node would be to the system redispatch (not to mention, this is assuming this information is even readily published).
There’s really no excuse to not adopt nodal pricing over whatever exists for a centrally planned grid operator. I can only really imagine it’s a political issue.
comment 3mo ago · link · parent
comment 1y ago · link · parent
I'd be happy to provide you the names of the firms I spoke to over email, if that would be of use!
comment 1y ago · link · parent
I've had a few chats with some folks working on battery startups, and I think the more conventional approach is to forecast prices + run an optimization to find optimal storage decisions. You could measure the system's performance by looking at how well the algorithm does when it has perfect information about prices (obviously, when you have perfect information about prices it is trivial to optimize the battery).
comment 2y ago · link · parent
Your second paragraph may be answered by this: https://www.ercot.com/gridmktinfo/dashboards/gridconditions. PRC units are available in real time, immediately on request.