You need to use #1 copper for a 100A subpanel, you can use 3/#2 aluminum cable for a 100A service entrance but there’s an exception that allows using wire rated at 83% of its ampacity for a service entrance conductor which does not apply for subpanels.
Refeed the two removed breakers out of the load center and add a 60A two pole breaker to feed the EV charger, if it’s a cord and plug charger that you plug into a NEMA 14-50R you’ll need a GFCI breaker, if it’s hardwired you don’t need a GFCI breaker.
The material can be purchased for less than $500 for this project, if you have to hire out the labor it’ll be considerably more expensive, I’d estimate one day for an electrician or around $1200-1800 depending on where you live.
comment 2mo ago · link · parent
I have access to a well-seeded 20+ year old private tracker but usually use the above method to stream content for free these days.
comment 2mo ago · link · parent
I’m puzzled as well, buying a car that depreciates 60-70% in 7 years seems like a horrible idea, you could spend roughly the same on a Toyota Highlander or Honda Pilot and only face 30-40% depreciation after 7 years. This information is freely available if you google “[vehicle model] depreciation curve”.
Nissan (and Stellantis, Mitsubishi) decided to stop making better cars and focus almost exclusively on subprime lending, the rest of the story tells itself once you have that information.
comment 2mo ago · link · parent
I can pay a bit extra for food and $10 in tips and fees to have it delivered to me instead of spending half an hour driving to go get it myself. I know what I’m paying for and value the service they provide.
comment 2mo ago · link · parent
Minnesota has the Metropolitan Council which derives its power from state statute and can supersede the decisions of local governments. The same people that bitch about ‘my tax dollars’ complain about the Met Council but I feel it provides a cohesive regional planing organization and they provide water, sewer, transportation, and regional parks. https://en.wikipedia.org/wiki/Metropolitan_Council_(Minnesot...
Portland, Oregon has a similar organization called Metro that I am not familiar with, other than it is similar to the Metropolitan Council. https://en.wikipedia.org/wiki/Metro_(Oregon_regional_governm...
comment 2mo ago · link · parent
I was taught that the safe way to keep using the old pre-8000 series wire is to use the specific listed fittings for this purpose (WAGO 221 series nuts are fit for purpose) with contact paste and a copper pigtail that connects to the device.
comment 2mo ago · link · parent
See Joseph McCarthy, HUAC, Hollywood blacklists, J. Edgar Hoover’s COINTELPRO and other domestic surveillance programs for a small slice of anti-communist efforts in the Cold War US.
comment 2mo ago · link · parent
If you have a fancy modulating furnace and variable speed compressor or a variable speed heat pump, a thermostat that uses a PID would work better.
comment 2mo ago · link · parent
There was an issue with aluminum wire and terminations, the wiring devices and breakers used for copper only wire didn’t work with aluminum (wrong coefficient of expansion of the metal where the terminations were made) and caused arcing and fires. Once the termination points were made out of an alloy that worked with both Cu/Al, it’s been safe to use.
comment 2mo ago · link · parent
I’d like to learn more about PLCs and SCADA, but that scope of work usually falls on another contractor, we mostly provide installation for BAS systems that control HVAC and chilled/hot water plants.
I do some water treatment plant projects and there’s a local contractor that handles the PLC and SCADA stuff.
comment 2mo ago · link · parent
I frequently have my electricians pull and terminate network cable if it’s only one or a few (daisy-chained VAV controllers or a network drop for a BAS panel), if the customer needs a formal TIA-568 test then I’ll sub that out. My electricians are already pulling and terminating building automation cable, CAT 6 isn’t gonna stop em :)
comment 2mo ago · link · parent
I sometimes hire directional boring and excavation contractors and if there’s any doubt as to where an electrical conduit or natural gas pipe is, I opt for the hydrovac truck to minimize risk.